Timeline
ruoxiran edited this page Apr 28, 2021
·
13 revisions
Pronunciation TF wants to make a publication every three months if possible.
- FPWD June 2021 (both Attribute model and Inline SSML)
- Liaison with WICG in July 2021
- Publish updating working draft after work with WICG June 1st 2021
- Decide Attribute model or Inline SSML by November 2021.
- Publish updating working draft after decide attribute by end of Dec 2021
- Start Wide review in May 2023
- Publish CR in Dec 2023
- Publish updating Working draft every three months if there are updates
- Publish updating Working draft every three months if there are updates
- Publish updating Working draft every three months if there are updates